Transmission Tariff Liability for LILO Lines Before DTL

The Supreme Court of India held that Power Grid Corporation of India Limited (PGCIL) was entitled to recover transmission tariff on a non-PoC basis for two Line-In Line-Out (LILO) assets commissioned in January 2015 up to 27.10.2016, when the generating company commissioned its Dedicated Transmission Line (DTL). Setting aside the Appellate Tribunal for Electricity (APTEL) orders, the Court restored the Central Electricity Regulatory Commission (CERC) order and ruled that delay in upstream lines to Salem and Madhugiri did not negate actual evacuation and use of the LILOs while the generator delayed its DTL.

Background and Procedural History

  • The dispute involved PGCIL’s tariff claim for two LILOs on both circuits of the Tuticorin JV–Madurai 400 kV D/C (Quad) transmission line at the Tuticorin Pooling Station, commissioned on 04.01.2015 and 08.01.2015, for the period up to 27.10.2016 when the generating company (Moxie Power Generation Ltd., formerly Coastal Energen Pvt. Ltd.) commissioned its DTL directly to the Tuticorin Pooling Station.
  • Under the 24.02.2010 Bulk Power Transmission Agreement (BPTA) (amended 08.09.2011) and Standing Committee on Power System Planning in Southern Region (SCPSPSR) meetings, the generator was to build its DTL to the Tuticorin Pooling Station, while PGCIL was to establish the Tuticorin Pooling Station and LILOs of both circuits of the Tuticorin JV–Madurai line (Part-A) and upstream lines toward Salem and Madhugiri (Part-B).
  • Power generation commenced on 23.12.2014 and was evacuated through a temporary LILO on the Tuticorin JV–Madurai line and supplied to distribution licensee TANGEDCO.
  • By order dated 29.07.2016, the CERC accepted the Commercial Operation Dates (CODs) of 04.01.2015 and 08.01.2015 and directed liability for the LILO transmission charges on the generating companies (including Coastal Energen) until their DTL became commercially operational, while declining to condone time over-run at that stage subject to truing-up.
  • APTEL overturned the CERC’s view on usage and COD (and on review remanded the COD issue), holding that the LILOs had no “beneficial use” before the upstream Salem–Madhugiri lines were operationalized and that Regulation 4(3)(ii) of the CERC Tariff Regulations, 2014 required redetermination/review of COD. PGCIL appealed to the Supreme Court.

Key Issues

  • Whether PGCIL was entitled to transmission tariff (on a non-PoC basis) for the two LILOs from 04.01.2015/08.01.2015 until 27.10.2016, given their inclusion in the BPTA and statutory planning under Section 29(4) of the Electricity Act, 2003.
  • Whether APTEL correctly interpreted Regulation 4(3)(ii) of the Tariff Regulations, 2014 in directing CERC to revisit the already-approved COD of the LILOs.
  • Whether the generator’s delay in constructing its DTL warranted placing liability on the generating company for the period between commissioning of the LILOs and commissioning of the DTL on 27.10.2016.

Legal Analysis and Ruling

  • Actual Use and Evacuation Through Pooling Station: Examining the evacuation arrangement and the generator’s own pleadings before APTEL, the Court found that power evacuated via the Tuticorin JV–Madurai line was routed through the LILOs and Tuticorin Pooling Station for onward transmission and supply to TANGEDCO. Delay in the upstream Tuticorin–Salem–Madhugiri transmission line did not prevent evacuation or use of the LILOs during the disputed period.
  • Statutory Scheme, DTL Obligation, and COD: Under Section 10 of the Electricity Act, 2003, constructing the DTL was the generating company’s duty. Under Regulation 3(53) and Regulation 4 of the Tariff Regulations, 2014, COD was validly accepted by CERC based on RLDC trial operation certification, CEA safety certification, and scheme approvals, and Regulation 4(3)(ii) did not require reopening COD where regular service of the LILOs was not prevented.
  • CERC’s Regulatory and Adjudicatory Powers: Relying on PGCIL v. Madhya Pradesh Power Transmission Co. Ltd., PTC India Ltd. v. CERC, and Energy Watchdog v. CERC, the Court held that CERC’s imposition of liability on the defaulting generator for the period prior to DTL commissioning (up to 27.10.2016) was valid and within jurisdiction.
  • Reading of CERC Order: The Court noted that paragraph 72 of CERC’s order recorded TANGEDCO’s submission rather than CERC’s final finding, whereas paragraphs 73–77 placed liability on the generating company based on the 30th SCM and BPTA framework.

Disposition

  • The Supreme Court answered the questions of law in favour of PGCIL, set aside the impugned APTEL orders in the appeals, restored the CERC order, allowed the appeals, and disposed of pending applications.

2026 INSC 1237

Power Grid Corporation of India Limited v. Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO) & Ors. (D.O.J. 18.11.2026)

Loading Viewer...

Next Story

Mesne Profits and Interest After Tenancy Termination

The Supreme Court of India upheld the High Court of Delhi’s determination of mesne profits at Rs. 7/- per sq. ft. per month for the ground floor and Rs. 5/- per sq. ft. per month for the mezzanine floor, along with 7.5% simple interest (reducible to 6% on timely payment), for wrongful occupation of premises at Ansari Road, Daryaganj, New Delhi after termination of tenancy. Dismissing the appeals, the Court found no legal infirmity or perversity in the High Court’s balanced evidentiary assessment and brought finality to a three-decade-old dispute.

Background and Procedural History

  • The appellants’ predecessors instituted a suit in 1990 for recovery of possession of premises at 1, Ansari Road, Daryaganj, New Delhi after terminating respondent no. 1’s tenancy from midnight of 31.12.1989, claiming damages for use and occupation at Rs. 1,47,500/- per month from 02.01.1990 with 15% interest.
  • By judgment and decree dated 22.12.1998, the Trial Court decreed possession and ordered a preliminary inquiry under Order XX Rule 12 of the Code of Civil Procedure, 1908 (CPC) for mesne profits; the decree for possession attained finality upon dismissal of SLP (C) No. 3879 of 2001 on 19.03.2001.
  • In the Order XX Rule 12 CPC inquiry, the Trial Court on 30.04.2004 fixed mesne profits at Rs. 22/- per sq. ft. per month (ground floor carpet area) and Rs. 11/- per sq. ft. per month (mezzanine floor carpet area) with 15% interest.
  • On 12.07.2010, the First Appellate Court set aside the Trial Court’s figures as speculative—noting differences between the old godown premises and the 1972 banking premises let to Vijaya Bank—and proceeded on the admitted rate of rent.
  • In RSA Nos. 186 and 187 of 2010, by judgment dated 11.08.2011, the High Court of Delhi held that the First Appellate Court overlooked respondent no. 1’s witness (DW-1) admission of prevailing local rent of Rs. 5/- to Rs. 8/- per sq. ft. per month, raising a substantial question of law under Section 100 CPC, and fixed mesne profits at Rs. 7/- (ground floor) and Rs. 5/- (mezzanine floor) with 7.5% simple interest (or 6% if paid within two months). The appellants appealed to the Supreme Court seeking higher mesne profits and 15% interest.

Key Issue

  • Whether the High Court erred in fixing mesne profits at Rs. 7/- and Rs. 5/- per sq. ft. per month and awarding 7.5% simple interest (with a 6% concession) upon finding that the First Appellate Court omitted material evidence regarding prevailing rental value.

Legal Analysis and Ruling

  • Compensatory Nature and Evidentiary Estimation: Citing Martin and Harris Private Limited v. Rajendra Mehta, the Court observed that mesne profits compensate the owner for wrongful occupation through a fair, reasonable estimate based on property nature, location, prevailing rental value, evidence, and attendant circumstances, without a rigid formula or routine appellate interference absent arbitrariness or legal error.
  • Omission of Material Admission Under Section 100 CPC: DW-1’s admission in chief examination that prevailing local rent at tenancy termination ranged between Rs. 5/- and Rs. 8/- per sq. ft. per month had a direct bearing on mesne profits, and overlooking it properly warranted correction under Section 100 CPC.
  • Balanced Rate, Interest, and Finality: The High Court’s rates fell within the evidentiary range shown by DW-1 without mechanically adopting the lowest figure or equating the premises with Vijaya Bank’s premises. Following Mahant Naryana Dasjee Varu v. Board of Trustees, Tirumalai Tirupathi Devasthanam, interest is an integral part of mesne profits, and the High Court’s interest rates and finality after over three decades of litigation were fair and reasonable.

Disposition

  • The Supreme Court found no ground to interfere and dismissed the appeals.

2026 INSC 1240

Bharat Bhushan Jain (Dead) Through LRs. And Others Etc. v. M/s Goodyear India Ltd. And Another (D.O.J. 18.11.2026)

Loading Viewer...

Next Story

Circumstantial Chain Fails in Murder Conviction Appeal

The Supreme Court of India set aside the conviction and life sentence of the appellant under Section 302 of the Indian Penal Code, 1860 (IPC), holding that the prosecution failed to establish an unbroken chain of circumstantial evidence beyond reasonable doubt. Reversing the concurrent findings of the Trial Court and the High Court of Karnataka, the Court acquitted the appellant under Section 302 IPC and ordered his immediate release.

Background and Procedural History

  • On the morning of 05.09.2013, complainant Ramappa (PW-1) was informed by phone that a woman’s body was inside an iron drum near a lime kiln in Harapanahalli Town; FIR Crime No. 178 of 2013 was registered under Sections 302 and 201 IPC against unknown persons, and the body was later identified as Sharadamma.
  • The prosecution alleged that the appellant, who had an illicit relationship with the deceased, suspected her of an affair with another man, strangled her with a plastic strap on the night of 04.09.2013, robbed her gold and silver ornaments, and placed her body in the drum.
  • Following the appellant’s arrest on 12.09.2013, ornaments were allegedly recovered from his house at Yarabalu village.
  • In Sessions Case No. 101 of 2014 (judgment dated 27.04.2017 and sentence order dated 28.04.2017), the Sessions Judge found homicidal death by ligature strangulation, rejected the “last seen” witnesses (PW-13 and PW-14) due to a nearly two-month delay in recording statements under Section 161 Cr.P.C., acquitted the appellant under Section 201 IPC (an acquittal that became final), and convicted him under Section 302 IPC solely on recovery under Section 27 of the Evidence Act.
  • By judgment dated 09.07.2024 in Criminal Appeal No. 1355 of 2017, the High Court of Karnataka dismissed the appeal, relying on PW-13 and PW-14 as well as the recovery of ornaments. The appellant appealed to the Supreme Court.

Key Issues

  • Whether the prosecution proved a complete, unbroken chain of circumstantial evidence—covering motive, “last seen together,” body discovery/concealment, and Section 27 ornament recovery—pointing solely to the appellant’s guilt under Section 302 IPC.
  • Whether doubtful recovery of ornaments could sustain a murder conviction under Section 302 IPC.

Legal Analysis and Ruling

  • Motive Based on Conjecture: General awareness of an alleged relationship did not prove motive to kill over suspected intimacy with another man, especially where close relatives admitted lack of personal knowledge of any affair or suspicion/quarrel.
  • “Last Seen” Delayed and Unexplained: Statements of PW-13 and PW-14 under Section 161 Cr.P.C. were recorded on 01.11.2013—nearly two months after the incident—without explanation, and the High Court reversed the Trial Court’s rejection without addressing the 58-day delay.
  • Body Discovery Inconsistencies: The phone informant alerting PW-1 was neither traced nor examined, and neither the inquest report nor the post-mortem report showed limestone stains on the deceased or her clothes.
  • Doubtful Recovery and Sanwat Khan Principle: Independent proof of disclosure under Section 27 Evidence Act was lacking; panch/appraiser testimonies and the recovery timeline conflicted (PW-13 stated police told him the day after the incident that ornaments were already found at the appellant’s house, whereas recovery was claimed eight days later). Applying Sanwat Khan v. State of Rajasthan and Raj Kumar @ Raju v. State (NCT of Delhi), unexplained possession of stolen articles does not by itself establish murder absent proof that robbery/theft and murder formed part of the same transaction.

Disposition

  • The Supreme Court allowed the appeal, quashed and set aside the conviction and life sentence under Section 302 IPC, maintained the acquittal under Section 201 IPC, acquitted the appellant under Section 302 IPC, directed his immediate release if not required in any other case, and disposed of pending applications.

2026 INSC 1239

Bheemanagouda @ Bheemajja v. State by Harapanahalli Police (D.O.J. 18.11.2026)

Loading Viewer...

Next Story

Limits on Section 37 Court Modifying Arbitral Awards

The Supreme Court of India held that a Division Bench exercising narrow jurisdiction under Section 37 of the Arbitration and Conciliation Act, 1996, could not modify an arbitral award to 50% and reduce interest to 6% merely because additional work claims exceeded 70% of the original contract value and “shocked the conscience” of the Court. Setting aside the impugned Section 37 judgment, the Court restored the arbitral award dated 03.11.2003 in full.

Background and Procedural History

  • The contractor was entrusted with dredging/evacuation work for the approach channel and basin of a shore-based pilot station at Sagar Island, completed by 17.04.2001 when inaugurated by the Chairman of the Port Trust of Calcutta, despite delay due to force majeure conditions.
  • Additional dredging work became necessary due to force majeure weather, soil-data mismatch, siltation, and lack of protective walls, reflected in the Port Trust’s letter dated 19.07.2000.
  • An arbitral award was passed on 03.11.2003 regarding the additional work, which was affirmed under Section 34 of the Arbitration and Conciliation Act, 1996, by a Single Judge.
  • On the awarder’s appeal under Section 37, a Division Bench of the High Court of Calcutta recorded that the award was not based on “no evidence” or “insufficient evidence,” nor perverse, patently illegal, or contrary to the fundamental policy of Indian law, yet modified it to 50% of the quantified amount with 6% interest from 08.02.2002 because additional work claims exceeded 70% of the original contract value.
  • Cross-appeals were filed before the Supreme Court by the contractor (seeking restoration of the award) and the Port Trust (seeking complete setting aside or, alternatively, upholding the modified award).

Key Issues

  • Whether the High Court Division Bench acted within its Section 37 jurisdiction in modifying the arbitral award based on the quantum of additional work exceeding 70% of the original contract and “shocking the conscience” of the Court.
  • Whether the absence of a formal completion certificate or the public/government status of the awarder justified interference or partial severance.

Legal Analysis and Ruling

  • Narrow Scope Under Section 37: Relying on Ssangyong Engineering & Construction Co. Ltd. v. NHAI and Somdatt Builders-NCC-NEC (JV) v. NHAI, the Court held that “shocking the conscience” or conflict with basic notions of morality or justice requires substantive, blatant grounds—not mere invocation of phrases because additional work exceeded 70% of the original contract or re-adjudication of evidence/merits.
  • Evidentiary Basis and Non-Issuance of Completion Certificate: The Arbitrator relied on measurements and invoices for additional re-dredging work, and non-issuance of a completion certificate by the Port Trust did not bar recovery for work actually executed. Batliboi Environmental Engineers Ltd. v. HPCL was distinguished as concerning damages rather than valid invoices for additional work.
  • No Special Treatment for State Entities & Inseparability: Under Pam Developments Private Ltd. v. State of West Bengal, parties in arbitration must be treated equally without special leniency merely because the award debtor is a government/statutory entity. Under Gayatri Balasamy v. M/s ISG Novasoft Technologies Limited, the invoices and measurements for additional dredging formed a single integrated character and could not be arbitrarily halved.

Disposition

  • The Supreme Court set aside the impugned Section 37 judgment, allowed the contractor’s appeal, restored the arbitral award, disposed of the Port Trust’s appeal, and disposed of pending applications.

2026 INSC 1238

M/s Marino Dredgeco Limited v. The Board of Trustees of the Port of Kolkata (D.O.J 18.11.2026)

Loading Viewer...

Next Story

Transmission Tariff Liability for LILO Lines Before DTL

The Supreme Court of India held that Power Grid Corporation of India Limited (PGCIL) was entitled to recover transmission tariff on a non-PoC basis for two Line-In Line-Out (LILO) assets commissioned in January 2015 up to 27.10.2016, when the generating company commissioned its Dedicated Transmission Line (DTL). Setting aside the Appellate Tribunal for Electricity (APTEL) orders, the Court restored the Central Electricity Regulatory Commission (CERC) order and ruled that delay in upstream lines to Salem and Madhugiri did not negate actual evacuation and use of the LILOs while the generator delayed its DTL.

Background and Procedural History

  • The dispute involved PGCIL’s tariff claim for two LILOs on both circuits of the Tuticorin JV–Madurai 400 kV D/C (Quad) transmission line at the Tuticorin Pooling Station, commissioned on 04.01.2015 and 08.01.2015, for the period up to 27.10.2016 when the generating company (Moxie Power Generation Ltd., formerly Coastal Energen Pvt. Ltd.) commissioned its DTL directly to the Tuticorin Pooling Station.
  • Under the 24.02.2010 Bulk Power Transmission Agreement (BPTA) (amended 08.09.2011) and Standing Committee on Power System Planning in Southern Region (SCPSPSR) meetings, the generator was to build its DTL to the Tuticorin Pooling Station, while PGCIL was to establish the Tuticorin Pooling Station and LILOs of both circuits of the Tuticorin JV–Madurai line (Part-A) and upstream lines toward Salem and Madhugiri (Part-B).
  • Power generation commenced on 23.12.2014 and was evacuated through a temporary LILO on the Tuticorin JV–Madurai line and supplied to distribution licensee TANGEDCO.
  • By order dated 29.07.2016, the CERC accepted the Commercial Operation Dates (CODs) of 04.01.2015 and 08.01.2015 and directed liability for the LILO transmission charges on the generating companies (including Coastal Energen) until their DTL became commercially operational, while declining to condone time over-run at that stage subject to truing-up.
  • APTEL overturned the CERC’s view on usage and COD (and on review remanded the COD issue), holding that the LILOs had no “beneficial use” before the upstream Salem–Madhugiri lines were operationalized and that Regulation 4(3)(ii) of the CERC Tariff Regulations, 2014 required redetermination/review of COD. PGCIL appealed to the Supreme Court.

Key Issues

  • Whether PGCIL was entitled to transmission tariff (on a non-PoC basis) for the two LILOs from 04.01.2015/08.01.2015 until 27.10.2016, given their inclusion in the BPTA and statutory planning under Section 29(4) of the Electricity Act, 2003.
  • Whether APTEL correctly interpreted Regulation 4(3)(ii) of the Tariff Regulations, 2014 in directing CERC to revisit the already-approved COD of the LILOs.
  • Whether the generator’s delay in constructing its DTL warranted placing liability on the generating company for the period between commissioning of the LILOs and commissioning of the DTL on 27.10.2016.

Legal Analysis and Ruling

  • Actual Use and Evacuation Through Pooling Station: Examining the evacuation arrangement and the generator’s own pleadings before APTEL, the Court found that power evacuated via the Tuticorin JV–Madurai line was routed through the LILOs and Tuticorin Pooling Station for onward transmission and supply to TANGEDCO. Delay in the upstream Tuticorin–Salem–Madhugiri transmission line did not prevent evacuation or use of the LILOs during the disputed period.
  • Statutory Scheme, DTL Obligation, and COD: Under Section 10 of the Electricity Act, 2003, constructing the DTL was the generating company’s duty. Under Regulation 3(53) and Regulation 4 of the Tariff Regulations, 2014, COD was validly accepted by CERC based on RLDC trial operation certification, CEA safety certification, and scheme approvals, and Regulation 4(3)(ii) did not require reopening COD where regular service of the LILOs was not prevented.
  • CERC’s Regulatory and Adjudicatory Powers: Relying on PGCIL v. Madhya Pradesh Power Transmission Co. Ltd., PTC India Ltd. v. CERC, and Energy Watchdog v. CERC, the Court held that CERC’s imposition of liability on the defaulting generator for the period prior to DTL commissioning (up to 27.10.2016) was valid and within jurisdiction.
  • Reading of CERC Order: The Court noted that paragraph 72 of CERC’s order recorded TANGEDCO’s submission rather than CERC’s final finding, whereas paragraphs 73–77 placed liability on the generating company based on the 30th SCM and BPTA framework.

Disposition

  • The Supreme Court answered the questions of law in favour of PGCIL, set aside the impugned APTEL orders in the appeals, restored the CERC order, allowed the appeals, and disposed of pending applications.

2026 INSC 1237